Welcome to the Industrial Automation website!

NameDescriptionContent
HONG  KANG
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Mine geological environment ecological restoration

来源: | 作者:佚名 | 发布时间 :2023-11-28 | 313 次浏览: | Share:

For our country, foreign open-pit mining experience can not be directly transplanted to China's mining with Wells. Its real embryonic stage in the 1980s to 1990s, such as 1982 Ma Enlin and other compiled "open-pit mining rehabilitation", the Ministry of Coal industry organized the implementation of the "six Five" scientific and technological research project - subsidence area comprehensive management of land reclamation research Institute was established in 1987, standard land reclamation began to be organized in China. The "Regulations on Land Reclamation" promulgated on November 8, 1988 and effective on January 1, 1989 (Decree No. 19 of The State Council) marked the beginning of China's land reclamation on the road of legalization. With the formation of land reclamation, the basic concepts and the definition of the basic problems have become important issues. The focus of the researchers, the concept definition of the subject and the practical application all show that land reclamation is not only about the restoration of land resources, but also about the restoration and reconstruction of the ecosystem and the role of protecting the environment.

This discussion on a clear concept lasted for many years, when the concept of "green mining" in mining areas was on the rise, and the awareness of ecological protection was raised all over the world. As the research focus of land reclamation gradually shifted to soil reconstruction, ecological restoration in mining areas, and vegetation reconstruction, the purpose of land reclamation was constantly clarified. In other words, the purpose of land reclamation in mining area should always be the restoration of mining area ecosystem, and the terms of land reclamation and ecological restoration have entered the public vision for the first time. Since then, researchers have begun to focus on dynamic land reclamation and ecological reconstruction from static land reclamation. Concepts such as dynamic pre-reclamation, mining while recovering and integration of mining and recovery have been constantly declared and discussed. Hu Zhenqi et al. (2013a, 2013b) discussed in detail the relationship and combination of mining, reclamation and ecological reconstruction in their papers on mining while recovering and integration of mining and recovery, which more closely linked land reclamation and ecological reconstruction with mining area mining itself. At the same time, researchers have found that the research fields of land reclamation, geological environment protection in mining areas, and ecosystem protection in mining areas are essentially exploring the problems of mining and ecological environment destruction and reconstruction at the same level and in the same content. In 2016, the Ministry of Land and Resources issued a document combining the "Mine geological environment Protection and Treatment restoration Plan" and the "Mine land Reclamation Plan", which means that the restoration of this mining geological environment was officially integrated.

From a certain point of view, the ecological restoration of mine geological environment is the integration of land reclamation and ecological restoration, mine geological environment protection and restoration management, and its integration is inevitable in the practice and theoretical definition of ecological restoration.

(2) Connotation and function of mine geological environment ecological restoration

In a clear definition, the ecological restoration of the mine geological environment should refer to the restoration and reconstruction of the destruction of the mine ecosystem caused by mining through a variety of ecological environmental restoration means. Mineral exploitation will inevitably lead to the destruction of the ecological system of the mine environment, so the ecological restoration of the geological environment of the mine is aimed at the problems caused by the mining, and its connotation is to balance the mining and ecological protection. In fact, it is a means of balancing the destruction of ecosystems by human development with their conservation, and its effects include:

1. Restore land resources and solve the contradiction between people and land

Land is the guarantee of human daily life, and land issue is an important problem in our country. Mining leads to the loss of a large number of land resources. Without the restoration of the geological environment and ecology of the mine, these land resources cannot be used again. The restoration of land resources and the improvement of the quality of land resources can effectively alleviate the contradiction between man and land.

2. Protect the ecological environment and improve the quality of life

Mine geological environment ecological restoration is a large-scale project closely combined with ecological environment reconstruction. The ecological significance of mine geological environment ecological restoration and land damage control caused by mining is extremely great. Not only can the environmental damage caused by large-scale coal mining be restored to a certain extent, but also the fragile ecosystem can be improved before mining. Building green shelterbelts through vegetation reconstruction can prevent the degradation of surrounding ecosystem and land erosion and desertification. Its influence on biodiversity, the diversity and stability of plant ecosystem, attracting the return of surrounding animal communities, increasing the diversity of animal communities, achieving the dynamic balance of plant and animal communities, and affecting air quality and local microclimate have significant effects on improving the quality of life of mining residents.

  • ABB BC25 Controller Module
  • ABB 3HAB8859-1/03A Industrial Control Module
  • ABB 3HAB9271-1/01B Robotic Control Interface Module
  • ABB 3HAC5498-1 High-Performance Control Module
  • ABB 3HAC5518-1 Industrial Control Module
  • ABB 3HAC5497-1 Industrial Control Module
  • ABB 3HAC7344-1 Mains line filter unit
  • ABB 3HAC7681-1 Process Interface Module
  • ABB 3HAC6428-1/04 high-performance control module
  • ABB 3HAC6157-1 Floppy sign/supply cable
  • ABB 3HAC10847-1 Ethernet on front,Harness
  • ABB 3HAC5566-1 Industrial Communication Bus Cable
  • ABB 3HAC9710-1 Heat exchanger unit
  • ABB IMFECI2 Industrial Control Module
  • ABB IMDS014 Digital Slave Output Module
  • ABB INIT03 Control Module
  • ABB 3HAC031683-004 Cable Teach Pendant 30m
  • ABB HAC319AEV1 High-Performance Control Module
  • ABB UFC092BE01 Binary input module
  • ABB DAPC100 3ASC25H203 Industrial Control Board
  • ABB 57160001-KX DSDO 131 Digital Output Unit
  • ABB 3HAC4776-1/1 Industrial Control Module
  • ABB DSTF610 terminal
  • ABB YB560100-EA S3 Industrial Control Module
  • ABB XO16N1-B20 XO16N1-C3.0 High-Performance Industrial Control Module
  • ABB TU804-1 Programmable Logic Controller (PLC) Module
  • ABB TU515 I/O terminal unit
  • ABB TK516 Connection Cable with Contacts
  • ABB SPCJ4D34-AA Industrial Ethernet I/O System Module
  • ABB SPAD346C Integrated Differential Relay
  • ABB 1SAM101904R0003 SK-11 Signal contact 1NO+1NC
  • ABB SE96920414 YPK112A Communication Module
  • ABB SC610 3BSE001552R1 Submodule Carrier
  • ABB SC513 PLC Analog Input Module
  • ABB SAFT110 Advanced Safety Termination Module
  • ABB RVC6-5A Control Module
  • ABB RB520 Linear Motion Controller Module
  • ABB R1.SW2/3 Industrial Control Module
  • ABB PU517 Controller Automation System
  • ABB PS130/6-75-P Industrial Control Module
  • ABB 3BSE008062R1 PM633 Processor Module
  • ABB L110-24-1 Industrial Control Module
  • ABB IMDSO14 Digital Slave Output Module
  • ABB DSU10 Control Module
  • ABB DSQC627 3HAC020466-001 Advanced Power Supply Module
  • ABB DSQC354 Industrial I/O Module
  • ABB DSQC352 High Performance Input/Output Module
  • ABB 37911-4-0338125 Control Module
  • ABB DSPC172 CPU Module
  • ABB DSBB175 Industrial PLC Expansion Module
  • ABB CR-M4LS Industrial Control Module
  • ABB CI626A 3BSE005029R1 Communication Interface Module
  • ABB BB510 (DC5256) Digital Control Module
  • ABB 61615-0-1200000 High-Precision Industrial Controller
  • ABB 3HNE 00313-1 TILLV.0317 Machine No. 64-25653
  • ABB 3HNA000512-001 Control Module
  • ABB 3HAC025466-001 Industrial Control Module
  • ABB 3HAB8101-8/08Y Industrial Control Module
  • ABB 3BHB003689 Multifunction Controller Module
  • ABB PXBHE65 206-00212 power module
  • ZUNKU 6203-2RS Deep Groove Ball Bearing
  • ZUNKU 6201-2RS Deep Groove Ball Bearing
  • ZYCOM IGLACS01281 Control Module
  • Zygo 8010-0105-02 ZMI-501 Displacement Measurement Interferometer
  • Zygo 1115-801-346 laser head cable
  • ZYGO HSSDC2 TO HSSDC2 CABLE 1115-800-055
  • ZYGO HSSDC TO HSSDC2 CABLE 1115-800-056
  • ZYGO ZMI 4104C Measurement Electronics Board
  • ZYGO ZMI-2002 8020-0211 Measurement Board
  • ZYGO 7702 8070-0102-35 Laser Head
  • ZYGO ZMI 7702 8070-0102-01X Laser Head
  • ZYGO ZMI-4004 4-Axis VME64x Measurement Board
  • ZYGO PC200 CS1115-801-346 Laser interferometer cable
  • ZYGO 8010-0105-01 ZMI Power Supply
  • ZYGO ZMI-2002 8020-0211-1-J Laser system measurement board card
  • ABB 35AE92 control card
  • ABB 200900-004 I/O Adapter PLC Board
  • Siemens 6ES7193-4CA40-0AA0 ET 200S Electronic Module
  • Siemens 6AV2124-2DC01-0AX0 Comfort Panel
  • Siemens 6ES7421-7DH00-0AB0 Digital Input Module
  • Siemens 6ES7350-2AH01-0AE0 Counter Module
  • Siemens 6ES7231-0HC22-0XA0 Analog Input Expansion Module
  • Siemens ET200SP 6ES7193-6PA00-0AA0 server module
  • Siemens 6ES7193-4JA00-0AA0 Terminal Module
  • Siemens 6AG1204-2BB10-4AA3 Ethernet Switch
  • SIEMENS 6GK1105-2AA10 SIMATIC NET series optical switching module (OSM ITP62)
  • Schneider Modicon Quantum 140CPU65260 Unity Processor
  • Schneider Modicon Quantum 140ACO02000 Analog Output Module
  • Schneider Modicon Quantum 140CPS11420 power module
  • Allen-Bradley 1747-CP3 SLC ™ Series of programming cables
  • Kollmorgen S33GNNA-RNNM-00 - Brushless Servo Motor
  • Kollmorgen 6sm56-s3000-g-s3-1325 - Servo Motor
  • Kollmorgen AKM52K-CCCN2-00 - Servo Motor
  • Kollmorgen PSR3-230/75-21-202 - Power Supply
  • Kollmorgen akm24d-anc2r-00 - Servo Motor
  • Kollmorgen AKM22E-ANCNR-00 - Servo Motor
  • Kollmorgen S60300-550 - Servo Drive
  • Kollmorgen B-204-B-21 - Servomotor
  • Kollmorgen AKM21E-BNBN1-00 - Servo Motor
  • Kollmorgen TT2953-1010-B - DC Servo Motor
  • Kollmorgen pa8500 - Servo Power Supply
  • Kollmorgen BDS4A-210J-0001-207C2 - Servo Drive
  • Kollmorgen TTRB1-4234-3064-AA - DC Servo Motor
  • Kollmorgen MH-827-A-43 - Servo Motor
  • Kollmorgen AKM24D-ACBNR-OO - Servo Motor
  • Kollmorgen 00-01207-002 - Servo Disk DC Motor
  • Kollmorgen AKM21C-ANBNAB-00 - Servo Motor
  • Kollmorgen PSR3-208/50-01-003 - Power Supply
  • Kollmorgen 6SM56-S3000 - Servo Motor
  • Kollmorgen DBL3H00130-B3M-000-S40 - Servo Motor
  • Kollmorgen 6SN37L-4000 - Servo Motor
  • Kollmorgen AKM65K-ACCNR-00 - Servo motor
  • Kollmorgen 6SM56-L3000-G - Servo Motor
  • Kollmorgen AKMH43H-CCCNRE5K - Servo Motor
  • Kollmorgen PSR4/52858300 - Power Supply
  • Kollmorgen KBM-79H03-E03 - Direct Drive Rotary Motor
  • Kollmorgen AKM33E-ANCNDA00 - Servo Motor
  • Kollmorgen U9M4/9FA4T/M23 - ServoDisc DC Motor
  • Kollmorgen AKM13C-ANCNR-00 - Servo Motor
  • Kollmorgen AKM43L-ACD2CA00 - Servo Motor
  • Kollmorgen AKM54K-CCCN2-00 - Servo Motor
  • Kollmorgen M-605-B-B1-B3 - Servo Motor
  • Kollmorgen AKD-P00606-NBAN-0000 - Rotary Drive
  • Kollmorgen 6SM-37M-6.000 - Servo Motor
  • Kollmorgen A.F.031.5 - Sercos Interface Board
  • Kollmorgen 918974 5054 - Servo PWM
  • Kollmorgen U12M4 - ServoDisc DC Motor
  • Kollmorgen AKD-B00606-NBAN-0000 - Servo Drive