Welcome to the Industrial Automation website!

NameDescriptionContent
XING-Automation
E-mail  
Password  
  
Forgot password?
  Register
当前位置:

Mining enterprise compliance management practice points seven: project construction compliance

F: | Au:佚名 | DA:2023-11-28 | 1065 Br: | 🔊 点击朗读正文 ❚❚ ▶ | Share:

3) Complete social stability risk assessment

When the construction unit organizes and carries out the preliminary work of the mine project, it shall investigate and analyze the social stability risk, consult the relevant masses, find and list the risk points, the possibility of risk occurrence and the degree of impact, put forward plans and measures to prevent and resolve the risk, and put forward suggestions on the level of social stability risk after taking relevant measures. The project approval declaration document shall contain the opinions on the social stability risk assessment report of the project, and attach the social stability risk assessment report.

4) Obtain the approval of the demarcation of the mining area

The demarcation of mining area belongs to the examination and approval process of mining right management. After the completion of mineral exploration and before filing an application for the mining right, the owner of the prospecting right shall apply to the registration administration authority for the delineation of the mining area on the basis of the geological exploration reserve report that has been reviewed and filed. Since some provincial natural resources authorities require mine construction projects to provide approval of demarcated mining area when they handle the pre-examination procedures for construction projects, the approval of demarcated mining area is also a prerequisite for mine project approval.

2. Key points of approval for mine project approval procedures

1) Scope of mine project to be approved and approval authority

Among coal mine projects, coal development projects with an additional annual production capacity of 1.2 million tons or more in coal mining areas planned by the State shall be approved by the industrial administrative department under The State Council, and projects with an additional annual production capacity of 5 million tons or more shall be approved by the competent investment department under The State Council and reported to The State Council for the record; Other coal development projects and general coal development projects within the mining areas planned by the State shall be approved by the competent investment departments of provincial governments. The development projects of iron ore and non-ferrous mines shall be approved by the competent investment departments of provincial governments. Rare earth and gold mine development projects shall be approved by provincial government investment authorities or industry authorities. Mining development projects outside the above-mentioned scope shall be subject to archival administration.

2) Review and decision of project approval

If the project approval authority needs to evaluate after formally accepting the project application report, it shall, in accordance with relevant provisions, entrust the engineering consulting institution with corresponding qualifications to conduct the evaluation. Where the construction of a project may have a significant impact on the public interest, the project approval authority shall take appropriate measures to solicit public opinion before making an approval decision. If the project meets the approval conditions, the project approval authority shall approve the project within the statutory time limit and issue the project approval document to the project unit.

3) Project approval effectiveness and approval changes

The construction unit shall start construction within 2 years from the issuance of the project approval document by the approval authority. If it is necessary to postpone the commencement of construction, the project unit shall apply to the project approval authority for an extension of the commencement of construction 30 working days before the expiration of the 2-year period. After the mine project has obtained the approval document, if the construction site has changed, the investment scale, construction scale, construction content has changed greatly, etc., the construction unit shall submit an application for change to the approval organ.

(2) Key points of compliance in the approval process of mining project commencement construction

In the process of preparing for the construction of a mine project, the construction unit needs to complete many other administrative approval items in addition to obtaining the project approval reply. Specific attention should be paid to the following compliance obligations:

1. Acquisition of mining rights

China implements licensing management of mineral resources. An enterprise applying for mining mineral resources shall be examined and registered by the competent department of natural resources and a mining license shall be issued. There are three main ways for mining enterprises to obtain mining rights: first, after obtaining exploration rights, mining enterprises can register mining rights through exploration and mining procedures after obtaining reserves through mineral resources exploration; Second, in accordance with the relevant provisions, directly in a competitive way or agreement to transfer the mining rights; Third, the mining rights are acquired through the secondary market transfer.

  • Sigmatek MDD111-1 DIAS Drive Axis Module
  • Sigmatek DKL042 05-024-042 Terminal Module
  • Sigmatek DM822 Control Module
  • Sigmatek CDM167 12-008-167-O Module
  • Sigmatek TAE151 Touch Display Unit
  • Sigmatek DCC041 SLIDES Module 05-700-041-D
  • Sigmatek AKM65M-ANC2GBB0 PM Servo Motor
  • Sigmatek ETT221 01-230-221 Operator Terminal
  • Sigmatek SLIDES DAM 124 Analog Module
  • Sigmatek AKM31C-ANCNGBB0 Servo Motor
  • Mannesmann Demag Sigmatek CP626 Central Unit
  • SIGMATEK 0332.554.03 Board 371071000154
  • SIGMATEK 12-250-021 Base Plate Back Panel CM5V020
  • SIGMATEK DM162 S-DIAS Digital Mix Module
  • DEMAG ERGOTECH 061 381 66 Sigmatek 9842.243.02 Circuit Board
  • SIGMATEK CP313-1 PLC Module
  • Sigmatek ETV0551-2 VARAN Touch Terminal
  • Sigmatek SDM 081 FS S-Dias Safety Module
  • DEMAG 05-250-023 Ergotech Motherboard with Sigmatek TMS012
  • Sigmatek CM5V020 12-250-023-K Wiring Base
  • Sigma Tek 5000B-37 Attitude Gyro Indicator
  • Sigmatek SDD120-2 DIAS Drive
  • Sigmatek CME221 Memory Module
  • Sigmatek DCP640 DIAS Central Unit
  • Sigmatek STO040 Safety Output Module
  • Sigmatek CET281 Control Panel
  • Sigmatek CIPC LX800 Demag NC5 CPU
  • Sigmatek DKL093 05-024-093 Terminal Module
  • Sigmatek AI088 20-009-088 Analog Input Module
  • Sigmatek CAI888 Analog Input Module
  • SIGMATEK CCA021 12-025-021 Analog Output Module
  • SIGMATEK 1104.579.05 Control Module
  • SIGMATEK SDI100 Digital Input Module
  • SIGMATEK C-IPC 256MB LX800 Compact Dias
  • SIGMATEK 9423.090.02 Control Module
  • SIGMATEK C-IPC 256 Power Supply 148498
  • SIGMATEK CAI025 Analog Input Module
  • SIGMATEK CTO166 Digital Output Module
  • SIGMATEK CP112 20-004-112 Processor Module
  • SIGMATEK CAI887 12-009-887 Safety Module
  • Sigma-Tek 4000B-31 Directional Gyro 1U262-002-42
  • Sigmatek C-IPC 256MB LX800 IPC Controller
  • Sigmatek C-IPC 01-450-031 Industrial PC LX800
  • Sigmatek C-IPC 256 Industrial PC Controller
  • Sigmatek CCP-531 PLC Processor Module
  • Sigmatek CDI163 Digital Input Module
  • Sigmatek ETV0501 VARAN Terminal 12-230-0501
  • Sigmatek CTMS020 C-DIAS Technology Module
  • Sigmatek CIV512 VARAN Switch Module
  • Sigmatek HU011 20-080-011 Interface Module
  • SIGMATEK SLIDES DAM 124 Module
  • SIGMATEK C-IPC 161 01-450-161L Industrial PC
  • SIGMATEK C-IPC 128MB VIA 733MHz 01-450-024-K
  • SIGMATEK 12-780-012 R8-IPC Geode LX800 Module
  • SIGMATEK CAM124 Analog Module
  • SIGMATEK S1 032-8AF61-R4 EZ Servo Motor
  • SIGMATEK CTO163 Digital Output Module
  • SIGMATEK CCP082 12-004-082 Processor Module
  • SIGMATEK CRCH081 C-DIAS Temperature Module
  • SIGMATEK PC322-K 01-310-322-K Industrial PC
  • SIGMATEK SDD310-2 Servo Drive
  • SIGMATEK AI084 Analog Input Module
  • SIGMATEK CRCH081 12-752-081 Temperature Module
  • Sigma-Tek 5000L-4 Attitude Gyro 1U284-001-3
  • SIGMATEK CM5V020 12-250-023-K Wiring Module
  • Sigma-Tek 4000H-6 Directional Gyro IU262-035-7
  • SIGMATEK Dias DCP160 05-004-160 Processor Module
  • SIGMATEK 0147.395.02 Control Module
  • SIGMATEK A1084 Control Module
  • SIGMATEK DI200 20-006-2000 Digital Input Module
  • Sigmatek DNC115 Encoder Module
  • Sigmatek DAM122 05-017-122 Analog Module
  • Sigmatek 9802.289.01 Control Board TA71 Display
  • Sigmatek TO127 20-007-127 Digital Output Module
  • Sigmatek DNC031 05-011-031 Digital Module
  • Sigmatek VI022 20-003-022 Interface Module
  • Sigmatek CAI085 Analog Input Module
  • Sigmatek CP111 S-DIAS CPU Module
  • Sigmatek CTMS030 Krauss Maffei Module
  • Sigmatek CAM123 Control Module
  • Sigmatek TAE732-P 01-240-732-P Touch Display Unit
  • Sigmatek MDM021 Digital Mixed Module
  • Sigmatek DCP642 DIAS Central Unit
  • Sigmatek CST022 12-014-022 C-DIAS Module
  • Sigmatek SRO021 20-893-021 Safety Relay Output
  • Krauss Maffei MC5 Control System Sigmatek
  • Sigmatek DC061 Module 18-24VDC 300mA
  • Herrmann EVT0855 Ultrasonic Welder Touch Panel
  • Sigmatek CIV521 Control Module 1.4A 2W
  • Sigmatek DDI61 05-006-161 Digital Input Module
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • Cessna S3326-1 Sigma Tek 5000B-67 Gyro 1U149-015-9
  • SIGMATEK PS101 Power Supply Module
  • SIGMATEK 0332.554.03 Control Module 371071000154
  • SIGMATEK ETT312-E Touch Terminal 01-230-312
  • SIGMATEK CDM163 Control Module
  • SIGMATEK VSV046 16-023-046 Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • SIGMATEK CTS051 12-053-051 Control Module
  • SIGMATEK AM221 20-017-221 Analog Module
  • Sigmatek CSDI161 12-891-161 Safety Input Module
  • Sigma Tek 4000C-1 Directional Gyro Indicator
  • Sigmatek ETV0501 12-230-0501 VARAN Terminal
  • Sigmatek DDM165 SLIDES Module
  • Sigmatek N100 20-011-100 Control Module
  • Sigmatek AKM54K-ANC2R-B0 PM Servo Motor
  • Sigmatek CTO166 Digital Output Module
  • Sigmatek CP212-K 20-004-212-K CPU Module
  • Sigmatek CDI161 Digital Input Module
  • Sigmatek DCC080 05-700-080-2 Control Module
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SCP011 S-DIAS Safety CPU
  • SIGMATEK SRO022 Relay Output Module
  • SIGMATEK MDD 121 Drive Axis Module
  • SIGMATEK DSI021 SLIDES Siemens Interface
  • SIGMATEK DIAS DCP161 Module 05-004-161
  • Sigmatek ETT312 Built-in Touch Terminal
  • SIGMATEK DCP 643 DIAS Controller System
  • SIGMATEK CIO021 Multi I/O Module
  • SIGMATEK CTMS020 Control Module
  • Sigmatek CME 221 Memory Module
  • Sigmatek 0420.615.01 Control Board
  • Sigmatek CP111 20-004-111 CPU Module
  • Sigmatek 9405.065.03 Control Board
  • Sigmatek ETEK 01-450-032-K C-IPC 256MB Industrial PC
  • Sigmatek CTO163 12-007-163 Safety Output Module
  • Sigmatek TO081 20-007-081 Digital Output Module
  • Sigmatek SI021 20-022-021 Safety Input Module