East Huizhou. The plant is owned by Guangdong Energy Group
Huizhou Daya Bay petrochemical area comprehensive energy station construction, including
Two combined cycle 9HA.01 heavy duty gas turbines
Group. After the project is put into operation in 2023, two gas turbines will be used
10% (by volume) hydrogen mixing ratio with day
Combined combustion of natural gas.
Scientific planning of hydrogen energy development path, increase the hydrogen energy industry chain
Research and development of key materials and key technologies in each link
The current technology is independent and controllable, which greatly reduces the cost of hydrogen energy use
It is the only way for China to move towards a zero-carbon future. In addition, in
China should also large-scale development of new energy generation of hydrogen, play
Green hydrogen fast power regulation characteristics and long period energy storage characteristics,
Cut the peak and smooth the valley for the power system
email:1583694102@qq.com
wang@kongjiangauto.com