Principles and technical contents of mine ecological restoration

F: | Au:佚名 | DA:2023-11-28 | 528 Br: | 🔊 点击朗读正文 ❚❚ | Share:

3. Wetland ecological restoration model in "wet beach area" of tailings pond

Most of the metal mine tailings ponds adopt the wet discharge technology, and its tailings have high water content. However, the overall comprehensive utilization level of tailings in China is not high at present, which leads to the existence of a large number of tailings ponds for a long time after the mine is closed. In some tailings ponds located in gullies, due to the inflow of surface water and groundwater and the difficulty in removing the water in the tailings, perennial water accumulation or swamping is formed. At this time, wetlands should be retained according to local conditions and plants with "acid, weight and water resistance" should be planted on the surface for restoration.

(4) Ecological restoration mode of mine construction land

The ecological restoration of mine construction land is mainly engineering restoration, and the content of biological restoration is less. Its ecological restoration mode mainly includes: mining cave-in backfill area, open mining mountain chassis area, mining industrial square construction land ecological restoration.

1. Ecological restoration model of construction land in mining subsidence area

As the subsidence area of many well mining hills is located in the urban built-up area or planning area, the surrounding infrastructure is relatively perfect, and the urban development has the demand for construction land, so the ecological restoration model is adopted as the construction land. The ecological restoration project in this mode is mainly a "geotechnical" project. By taking ground backfill and foundation treatment measures to the mining subsidence area, the mining subsidence backfill area can meet the requirements of construction land.

This restoration model has been widely used in Huainan, Huaibei, Tangshan and other places in China. The landfill project in Huainan coal mining subsidence area adopts a series of remediation measures such as horizontal seepage prevention, vertical seepage prevention, landfill gas management, environmental monitoring, and ecological restoration. The total investment of the project exceeds 96 million yuan. After comprehensive treatment, the former "garbage mountain" has undergone beautiful evolution and become an ecological park with fitness, leisure and spectacular scenery.

In mid-October 2018, during the review and inspection of the World Bank inspection team, Mr. British International Municipal expert. Christopher Banes, who has been to more than 50 countries in more than 40 years of work at the World Bank, gives high marks to the landfill closure project in Huainan as the best clean-up project he has seen. At the same time, the project won the third prize of science and Technology of China Urban Environmental Health Association.

2. Ecological restoration model of construction land in open mining chassis area

The underbed area of open mining mountain is generally a relatively gentle zone with a certain area, especially large open mining mountain. The restoration mode of underbed area is mostly woodland or dry land. However, the underbed of open mining mountain with a large area located near the urban area or in the suburbs with convenient transportation will also be restored as a construction land as a choice.

3. Ecological restoration model of construction land for industrial square, waste dump, waste rock dump and living area

All kinds of mining industrial squares, as long as the infrastructure is easy to support, can be used as construction land repair. Safety coal pillars are reserved in the industrial squares of coal mining mines, the surface is stable, and only the construction structures need to be dismantled, which can be directly used as construction land. If the coal seam mining collapses in the industrial squares, it needs to be used after restoration works; Some large mining living areas themselves have perfect infrastructure construction, and can be completely retained as construction land after the closure of the pit, without investing too much restoration projects.

Beijing Lujiashan Circular Economy Industrial Park is a representative of such projects. The construction of the park uses post-mining pits to optimize site conditions through ecological restoration and other means, and plans to build solid waste treatment facilities such as domestic waste incineration, kitchen and construction waste, supplemented by education centers, scientific research centers and environmental parks. Build a national circular economy (vein industry) demonstration base. The project covers an area of about 2100 mu, with a total investment of about 4.6 billion yuan.

(5) Ecological restoration mode of Mine Mountain Park

The mine is the source of mineral resources and the site of mining activities, which promote the development of human civilization. After the end of mining, the abandoned land of mining and mining and other facilities occupy an area, which is called mining relics. It is a historical witness of human mining activities in different ages, and part of it can become a historical and cultural heritage with important value. The construction of mine park is also a new ecological restoration model for the large area subsidence area near the city.

  • Basler BE1-59N A5EE1KC0N0F Ground Fault Relay
  • Basler BE1-79A Reclosing Relay
  • Basler BE1-32R E1EA1OA0N0F Reverse Power Relay
  • Basler DCQA-103 DCQC104-1 CMX-7D Circuit Board
  • Basler SSR125-12 Static Regulator 918500102
  • Basler 90 17709 112 Regulator Control Board
  • Basler AVC63-4 AVC634 Voltage Regulator
  • Basler 9 1049 04 100 PC Board Control Module
  • Basler SR4A-2B03B3A Static Voltage Regulator
  • Basler SR8A-2B15B3A Static Voltage Regulator
  • Basler KR7FFX Static Regulator 840V
  • Basler EL200-7 Voltage Regulator 90-660VAC 7A
  • Basler PRP210-1 Reverse Power Relay 9056300102
  • Basler SSR 63-12 Static Regulator 600VAC
  • Basler 9289901106 Digital Board
  • Basler DECS100 Voltage Regulator DECS100A01
  • Basler Electric CEM-2020 Contact Expansion Module
  • Basler Electric BE3-25-1 C1 N4 Synchronizing Check Relay
  • Basler Electric ACA2000-50GM GigE Camera 2MP 50fps
  • Basler Electric ACA2240-20GMSYM GigE Camera Sony IMX264
  • Basler BE1-50G Ground Overcurrent Relay
  • Basler PRS250 Veri-Sync Relay
  • Basler MOC2199 Output Module
  • Basler UFOV 260A Underfrequency Overvoltage Module
  • Basler BE-15482-001 Control Module
  • Basler LSP4-7 Protective Relay
  • Basler SCP 250-G-60 VAR Power Factor Controller
  • Basler BE146N Negative Sequence Overcurrent Relay
  • Basler APR63-5 Automatic Voltage Regulator
  • Basler 9507900107 SR8A Retrofit Voltage Regulator
  • Basler BE1-320 Directional Power Relay
  • Basler KR7F Voltage Regulator 9116200100
  • Basler UFOV 260A Overvoltage Protective Module
  • Basler AEC63-7 Analog Excitation Controller
  • Basler 9992D90G01 Control Module
  • Basler 6966D22G01 Control Board
  • Basler 6965D40G01 Control Board
  • Basler BE1-50/51M-104 Overcurrent Relay
  • Basler BE1-BPR Programmable Breaker Relay
  • BASLER Electric SSR 125-9 1256 00 102 Static Voltage Regulator
  • Basler Electric MVC 112 Manual Voltage Control
  • Basler Electric 9321000102 Control Module
  • Basler Electric RA-70-MDCT7 Rectifier Assembly
  • Basler Electric ACA1300-60GM GigE Camera
  • Basler Electric 6427C85G01 Interface Board
  • Basler Electric 6965D05G01 Control Board
  • Basler Electric ACA2500-14UC Current Transducer
  • Basler Electric 9170206111 Protective Relay
  • Basler Electric BE1-11-G6D1M1J1P0E000 Protection Relay
  • Basler Electric BE1-50/51B-107 Overcurrent Relay
  • Basler 9121000106 Voltage Controller
  • Basler B3E-E1P-A0N0F Solid State Protective Relay
  • Basler 9121000106 Manual Voltage Control
  • Basler PRP320 Motor Pull-out Relay
  • Basler SSE-N 250-9KW Shunt Exciter Regulator
  • Basler BE1-50-51B-107 Overcurrent Relay
  • BASLER ELECTRIC MVC 108 MANUAL VOLTAGE CONTROL MODULE 9 0370 00 102
  • Basler BE1-59N-A7E-D1J-D0N0F Ground Overvoltage Relay
  • Basler BE1-46N-G1E-B8P-B0N0F Negative Sequence Overcurrent Relay
  • Basler BE1-951 Overcurrent Protection System
  • Basler Electric MOC2199 Motor Operated Potentiometer
  • Basler Electric BE1-60 Voltage Balance Solid State Relay B1FA1C1M1F
  • Basler Electric BE1-67N Directional Overcurrent Relay
  • Basler Electric PIA2400-17GM Interface Module
  • Basler Electric V6RAB Rectifier Module
  • Basler Electric BE1-32R Reverse Power Relay B2E E1R A0N1F
  • Basler Electric IFM-150 Firing Circuit Chassis 120V AC
  • Basler Electric IFM-102 Firing Circuit Chassis 120V AC
  • Basler Electric 9170206111 NSNP Control Module
  • Basler Electric SSR 63-12 Static Voltage Regulator
  • Basler UFOV 260A Overvoltage Protective Module
  • Basler SCA1300-32GM CCD Camera Lens Enclosure
  • Basler BA1-27 Under Voltage Relay
  • Basler 149D866G06 Control Board
  • Basler 9072300130 Power Supply Module
  • Basler CBS 305 Current Boost System
  • Basler BE1-60 Voltage Balance Relay
  • Basler Electric CBS 212 Current Boost System Sensing 120/240VAC 50/60Hz 10VA
  • Basler MVC-300 Manual Voltage Control Unit
  • Basler SSR125-12 Static Voltage Regulator 918500102
  • Basler SR32A2B05B3E Static Voltage Regulator
  • Basler Electric BE1-59N Ground Fault Overvoltage Relay
  • Basler Electric 9110000113 Excitation Module
  • Basler Electric 90-72300-114 Control Accessory
  • Basler Electric PRS-250 Protection Relay System
  • Basler Electric BE1-50/51M-109 Overcurrent Relay
  • Basler Electric SR4A1B10B3E Static Voltage Regulator
  • Basler Electric CBS 212 Current Boost System
  • Basler Electric SR32A2B05B3E Static Voltage Regulator
  • Basler Electric MOC2207 Motor Operated Potentiometer
  • Basler Electric SR4A1B05A3E Static Voltage Regulator
  • Basler Electric BE1-32R Power Relay B2EE1PA0N1F
  • Basler BEI-81 Underfrequency Relay
  • Basler CBS 212A Current Boost System
  • Basler SSR 63-12 Static Voltage Regulator
  • Basler DGC-2020 Digital Genset Controller
  • Basler BE1-32 Reverse Power Relay
  • Basler BE1-50/51B-207 Overcurrent Relay
  • Basler BE1-951 Overcurrent Protection System
  • Basler 9073800-103 Power Supply
  • Basler SCA1300-32FC CCD Camera
  • Basler 9073800-103 Power Supply
  • Basler SCA1300-32FC CCD Camera
  • Basler L304KC Protective Relay
  • Basler BE3-25-1S1N4 Time Overcurrent Relay
  • Basler 9032300113 Excitation Support System
  • Basler BE1-59N Ground Overvoltage Relay
  • Basler MVC-300 Manual Voltage Control Unit
  • Basler MOC2102 Potentiometer
  • Basler BE1-87G Generator Differential Relay
  • Basler Electric DECS-200 Digital Excitation Control System
  • Basler Electric DECS 125-15-B2C5 Digital Excitation System
  • Basler Electric PLA2400-12GM Power Supply
  • Basler Electric BE1-50/51B-235 Overcurrent Relay
  • Basler Electric BE1-27/59 Undervoltage Overvoltage Relay
  • Basler Electric CEM-2020 Contact Expansion Module
  • Basler Electric BE1-32R Solid State Power Relay
  • Basler Electric BE1-700 Digital Generator Management Relay
  • Basler Electric BE1-59N Ground Fault Overvoltage Relay
  • Basler Electric BE10493002 Protection Module
  • Basler Electric BEI-79A1AA5CA3M1F Digital Annunciator
  • Basler Electric SSR 32-12 Static Voltage Regulator
  • Basler Electric BE1-CDS240 Current Differential System
  • Basler Electric BE1-67 Directional Overcurrent Relay
  • Basler Electric 9121000106 DECS-100 Voltage Controller
  • Basler Electric BEI-871 Interface Module
  • Basler Electric 8650C72 Exciter Control Module
  • Basler Electric RDP-110-S1 Generator Annunciator