Analysis of the development trend of China's iron ore mining technology in the "13th Five-Year Plan"

来源: | 作者:佚名 | 发布时间 :2024-02-01 | 343 次浏览: | Share:



With the continuous advancement of mining modernization, mineral resources are constantly consumed, and the scale of mining is constantly expanding, and the expansion of mining scale drives the continuous development of mining technology. At present, due to the continuous sharp decline in iron ore prices, the development of domestic iron ore enterprises is facing severe challenges, the deterioration of resource conditions makes it more difficult to mine, and the development of social environment also puts forward new requirements for mine development. Therefore, during the "13th Five-Year Plan" period, in order to cope with the changes in the industry situation and adapt to the requirements of The Times, it is necessary to continuously develop mining technology, reduce costs and increase efficiency through the application of new technologies and technological transformation measures, improve the competitiveness of enterprises, and steadily improve the level of mining technology in China.

1. Development status

After decades of development, especially more than a decade in the new century, the mining technology level of China's iron ore industry has made obvious progress.

(1) Open pit mining

In the open pit mining, the mining process is more mature, the mode of transportation is more diversified and efficient, with the application of steep mining, continuous semi-continuous mining process, mobile crushing station, steep slope railway transportation, vibration feeder loading station, automobile - elevator and other technologies, waste free mining technology, mining digitization, intelligent and other advanced technologies. Mine production efficiency has been significantly improved.

(1) Staging mining technology. Compared with full-range mining, phased mining has the advantages of provincial investment, quick effect, and less infrastructure investment to reach production as soon as possible. Some large steeply inclined open-pit mines in China have successfully realized the stage mining technology, such as Nanfen Iron mine, Shuichang Iron mine, Qidashan Iron Mine and so on.

(2) Intermittent continuous transportation technology. The discontinuous production process has been successfully applied in the deep concave open pit mine in China. The system is mainly composed of two parts, the discontinuous part refers to the automobile or locomotive transportation, and the continuous transportation part refers to the crusher tape machine and the soil discharge machine. With the development of open pit mining in China to deep mining, the significance of this technology is becoming more and more prominent. At present, the technology has been applied in Qidashan Iron ore, Shuichang Iron ore, Donganshan Iron ore, Dagushan Iron ore, Nanfen Iron ore and so on.

(3) High step mining. Step height is the main parameter of open-pit stope, increasing step height is conducive to improving the efficiency of penetration and explosion, simplifying and shortening the transportation line, increasing the amount of stage ore and improving the continuity of operation. In recent years, with the gradual popularization of large shovel equipment, high step mining technology is more and more favored by mining enterprises, the domestic open pit iron ore step height generally reaches 12 meters, Qidashan iron mine step height has reached 15 meters.

(4) Steep mining. Since the 1970s, metal mines in China began to carry out experimental research on steep mining technology. During the "Eighth Five-Year Plan" period, steep mining was included in the national science and technology research project, and carried out large-scale industrial test research in Nanfen open-pit mine, which comprehensively and systematically revealed the technological characteristics of steep mining, laid the technical foundation for the production and construction of Nanfen Iron mine, and provided practical experience for the technical transformation, new construction and expansion of large and medium-sized open-pit mines in China. Steep mining has been widely applied in open-pit iron mines in China because of its advantages such as small initial stripping amount, small amount of infrastructure works, short construction period and short final slope exposure time.

2. Underground mining

Underground mining technology is a technical field that has carried out the most extensive scientific research work and achieved the most scientific and technological achievements in more than 60 years since 1949. A large number of technical achievements have been made in the aspects of tunneling, mining methods, mine filling, etc. With these achievements as technical support, modern underground mines such as Meishan Iron Mine and Jingtieshan Iron Mine have been built. Therefore, it promotes the rapid development of underground mining technology in our country, and makes the technology of some mines reach the international advanced level.

(1) Develop modes of transportation. After years of development, the domestic underground iron ore is mainly developed by the joint development of shaft and slope. At the same time, some mines still adopt other development methods in combination with their own characteristics. Taking Dahongshan Iron Mine as an example, the mine adopts the joint development mode of inclined shaft taping machine - trackless ramp - blind shaft to replace shaft upgrading, reduce infrastructure investment, and be innovative, reaching the international advanced level.

(2) Mining method. The backward horizontal filling and shallow hole retaining mining methods have been basically eliminated in iron mines, and sublevel caving without bottom pillar is generally adopted in production mines, and the stage height is gradually increased, reaching 132 meters in Meishan Iron Mine and 140 meters in Chengchao Iron mine. The height of the sections and the route spacing were also increased to 15 meters ×20 meters or even 18 meters ×20 meters. In recent years, with the continuous expansion of underground mining scale and more stringent environmental protection policies, the application of large-diameter and deep-hole open-stope method and sublevel open-stope subsequent filling mining method in iron mines has become more and more.

(3) Digital mining technology. Meishan Iron Mine as the representative, through the integration of information and automation, break through the traditional mine production management, remote management, visual monitoring, digital decision-making and other effects. It is of great significance to improve production efficiency, change production safety, improve working environment and promote green coordinated mining.

Second, there are problems

Although China's mining technology has made obvious progress, there are still some problems, mainly reflected in the uneven development of mining technology, the low level of digital mines, mining equipment for technical development is not enough support.

(1) Uneven development of mining technology

China's vast territory, the national economic development level is very different, the level of mining development is also very different. The advanced large-scale mining technology represented by Qidashan Iron mine, Yuanjiacun Iron mine and Shuichang Iron mine has basically reached the international advanced level, while in the less developed areas, the mining technology is still very backward, with low production efficiency, low recovery rate, high dilution rate and serious waste of resources.

(2) The level of digital mining is much different from that of foreign countries

So far, China's digital mining has made great achievements, but compared with the mining developed countries, the overall level is still very low, is still in the initial stage of development. For example, remote control mining, unmanned working faces and even unmanned mines have become a reality in Canada, Sweden, the United States, Australia and other countries, but China has not yet realized. The United States has successfully developed a large-scale mining scheduling system, which uses the latest computer, wireless data communication, scheduling optimization and global satellite positioning system technology to carry out real-time computer control and management of open-pit production. Some underground mines in addition to the fixed equipment has been automated, scraper, drilling truck, underground car all realized driverless, workers just on the ground remote control of these equipment, you can ensure the smooth progress of mining operations.

(3) The support of mining equipment for technological development is not enough

The development of mining technology needs to be promoted through the synchronous updating of mining equipment, such as open-pit mining technology must be matched with large-scale shovel, the realization of digital technology needs intelligent equipment to support, but at present, China's mining equipment is still mainly introduced, digestion, absorption and innovation, new equipment independent research and development, large-scale and system integration ability is poor. Industrial manufacturing capacity is weak, can not adapt to the upgrading of mining technology, to a certain extent, hinder the advance of domestic mining technology.

Third, the "13th Five-Year" mining technology development trend

(1) Development direction

1. The change of macro situation brings both opportunities and challenges to the development of mining technology

Over the past decade, China's iron ore industry has experienced a stage of rapid expansion of investment and production capacity, which has also promoted the significant development of mining technology. During the "13th Five-Year Plan" period, economic growth has slowed down, market demand has declined, the relationship between supply and demand has reversed, and the development of the iron ore industry is facing great pressure, on the one hand, it means that investment in mining technology research and development will tend to be tight, on the other hand, in the downturn of the industry, enterprises need to reduce production costs through the application of new processes and new technologies, improve production efficiency and enterprise competitiveness.

2. Mining technology is developing in the direction of high efficiency, green and digital

During the "13th Five-Year Plan" period, the development of mining technology will continue to trend towards the simplification of production processes, the continuity of production processes, the centralization of mining operations, and the digitization, intelligence and unmanned operation processes. In the process of development, it is necessary to adhere to independent innovation as the driving force for the sustainable development of technology, energy saving and green manufacturing as an important starting point for technological transformation, the deep integration of industrialization and information technology as an important measure of technological progress, and the industrialization of technological achievements as an important support for the strength of iron mining industry.

(2) Key technologies

During the "13th Five-Year Plan" period, the development of mining technology needs to be closely combined with the guidance of industry macro policies, changes in resource conditions, protection of the ecological environment and social impact, so as to adapt to and promote the progress of the entire industry, therefore, mining technology in the "13th Five-Year Plan" period to focus on the following aspects of development.

1. Open-pit to underground mining and open-pit - underground combined mining technology

With the end of a number of open-pit mines such as Ekou Iron mine and Malanzhuang Iron mine, they have been transferred to underground mining, and the technology of open-pit to underground mining or open-pit to underground combined mining has fallen behind the actual needs of mine production. The research of open-pit to underground mining technology involves many technical problems, especially the transition problem of open-pit to underground mining, the mining problem of isolated layer and the rock mechanics problem of open-pit to underground mining or open-pit to underground combined mining, so it is urgent to increase the research during the "13th Five-Year Plan" period.

2. Deep mining technology

With the depletion of shallow resources in China, iron ore mining has gradually shifted to deeper ones. Most of the newly discovered iron ore resources are deep ore deposits, such as Dataigou Iron ore mine, Chentaigou Iron ore mine and Sishanling Iron Mine in Liaoning Province. The buried depth of ore bodies has exceeded 1000 meters. Different from shallow mining activities, deep mining has many special laws and disasters. The prominent feature is the "three high", that is, special mining technical conditions such as high ground stress, high well temperature and high water pressure, which may lead to stope roof collapse, roadway instability, high temperature and high heat, ventilation difficulties and other problems, resulting in the reduction of efficiency of lifting, ventilation and drainage and the increase of cost. This requires that mining technology and equipment must adapt to this change, carry out in-depth research on the key mining technology of iron ore deep resources, and provide technical support for more and more iron mines to enter deep mining.

3. Digital mining technology

The digital mine is the digital representation and understanding of the whole mine, with the various application technology software of the mine as the tool, with the efficient and automated data acquisition system as the means, and finally achieve a high degree of information, automation, high efficiency, and even unmanned mining and intelligent mining. This is a complex and huge project involving many technical fields and the organization of production departments. Its application potential in mining engineering design, production scheduling, system monitoring and disaster prediction needs to be deeply explored, and it will also be the future development direction of iron mines in China, including digital geological modeling system and digital ore deposit modeling system. Mining simulation technology under virtual conditions; Open pit and underground mine communication, positioning and navigation, information rapid processing and process monitoring technology; Intelligent control and control technology of mining equipment.

4. Green mining technology

Green mining technology includes low grade ore deposit mining technology and waste free mining technology. China's iron ore resources are mainly poor ore. For low-grade ore deposits, such as ultra-poor vanadium titanium magnetite in Chengde area, mining by traditional mining methods has high production cost and serious environmental damage. It is worth further research on how to utilize low-grade ore and difficult-to-mine body. In addition, in the process of mining, it not only causes damage to the natural environment, but also produces a lot of waste gas, wastewater and waste residue. Waste free mining is to minimize the output and discharge of waste, improve the comprehensive utilization rate of resources, reduce or eliminate the negative impact of mineral resources development technology. In the long run, with the improvement of social environmental protection requirements, green mining technology will be one of the important research topics in the sustainable development of mining industry.


  • GE Fanuc - A16B-3200-0020 Circuit Board Industrial Automation Core Component
  • GE IS420UCSBH3A - Advanced Industrial Control Module
  • GE Fanuc - IC693APU300J PAC Systems RX3i PLC Controller
  • GE FANUC - IC693MDL654 Modular Control System
  • GE Fanuc - DS200GDPAG1AEB Industrial Control Module for Advanced Automation
  • GE Fanuc - IC694ACC310 Filler Module Advanced Process Control Solution
  • GE Fanuc - IC200MLD750 Output Module Versamax PLC
  • GE IS220PSCAH1A - Advanced Power Control Module for Turbine Systems
  • GE Fanuc - IC220STR001 Direct Motor Starter for Precision Control
  • GE Fanuc - IC698CPE020-GP Slot Rack Card High Performance Control Module
  • GE FANUC - IC693MDL240 Modular Control Module
  • GE Electric - IC693PBM200-FE Master Module Industrial Automation Control Core Component
  • GE URRHV - Power Supply Advanced Industrial Control
  • GE DS6800CCID1D1D - Industrial I/O Interface Module
  • GE MULTILIN - EPM 9650 POWER QUALITY METER PL96501A0A10000
  • GE Electric - Fanuc IC697CMM742-KL Advanced Type 2 Ethernet Interface Module
  • GE Fanuc - IS200TBAIH1C Analog Input Terminal Board
  • GE FANUC - IC600FP608K IC600LX624L Memory Module for Industrial Automation
  • GE Fanuc - 531X135PRGAAM3 Programmer Card Board
  • GE IC200PER101E - Power Supply
  • GE IS420ESWBH3A - High-Speed Industrial Ethernet IONet Switch
  • GE Electric - EPSCPE100-ABAG Standalone PACSystems RSTI-EP Controller
  • GE IS200ICBDH1ACB - Advanced Industrial Control PCB for Critical Applications
  • GE DS200FCGDH1BAA - Precision Gate Distribution & Status Card for Industrial Control Systems
  • GE Fanuc - IC660HHM501R Portable Monitor for Industrial Automation
  • GE DS200IMCPG1C - Power Supply Interface Board for Industrial Controls
  • GE FANUC - IC695ALG508 Advanced Control Module for Industrial Automation
  • GE VM-5Z1 - PLC Module Programmable Logic Controller
  • GE FANUC - IC754CKF12CTD QuickPanel Control Industrial-grade HMI for Precision Automation
  • GE UR - 9GH UR9GH CPU High-Performance Control Module for Industrial Automation
  • GE IS220PGENH1A - Generator Power Unit (I/O)
  • GE Electric - IS220PD0AH1A Industrial Control System I/O Pack Module
  • GE IC694ALG221B - High-Performance Bus Expansion Cable for Enhanced PLC Connectivity
  • GE IC693MDL752 - High-Performance Negative Logic Output Module
  • GE DS200VPBLG1AEE - High-Performance Circuit Board
  • GE Electric SR745-CASE - 745-W2-P5-G5-HI-T Excellent Value
  • GE IS200TTURH1CBB - High-Performance Programmable Logic Controller Module
  • GE A06B-0227-B100 - Servo Motor Precision
  • GE 8021-CE-LH - High-Performance AC/DC Coil Contactor
  • GE FANUC - IC693BEM340 High-Speed Ethernet Controller Module
  • GE DS200SDCIG2AGB - Advanced DC Power Supply & Instrumentation Board for Industrial Control
  • GE FANUC - IC693CHS397E CPU Base Advanced Control Module for Industrial Automation
  • GE UR7BH - Relay Module High Performance Relay for Industrial Control Applications
  • GE FANUC - A17B-3301-0106 CPU MODULE
  • GE Fanuc - HE693ADC415E Drive Module
  • GE IS200VAICH1D - Analog Input Module for Industrial Control Solutions
  • GE Fanuc - DS200SHCAG1BAA High-Performance Turbine Energy Shunt Connector Board
  • GE Fanuc - IS215VCMIH2CC | Communication Card
  • GE IC690ACC901 - Mini Converter Kit Efficient Communication Solution
  • GE Electric - DS3800HCMC Gas Turbine Daughter Board For Enhanced Control & Efficiency
  • GE Electric - FANUC IC200ALG320C Analog Output Module
  • GE Electric - (GE) IS420UCSBH3A REV D
  • GE IC693MDL646B - Advanced Input Module for Industrial Control Solutions
  • GE IC693MDL730F - Advanced Digital Input Module for Industrial Automation
  • GE IC200ALG240 - Analog Input I/O
  • GE IC660BBD020Y - | DC Source I/O Block
  • GE Electric - IC698ACC735 Shielded Single Slot Faceplate
  • GE Fanuc - IC200MDL730 Discrete Output Module
  • GE IS200VAOCH1B - VME Analog Output CD for MARK VI
  • GE IC200ALG328E - High Precision Analog Output Module
  • GE Fanuc - IC200CHS001 A Cutting-edge VersaMax PLC
  • GE UR6DH - Digital I/O Module Advanced Power System Communication
  • GE Fanuc - IC695CHS007 Universal Control Base
  • GE VMIVME-2540-200 - Intelligent Counter & Controller
  • GE Fanuc - DS200LDCCH1ARA Advanced Mark VI Circuit Board for Industrial Automation
  • GE DS3800HMPG - Cutting-Edge CPU Card for Advanced Industrial Control
  • GE IS220PAICH1B - 10 Analog Inputs & 2 Analog Outputs
  • GE DS200TCQAG1BHF - Analog Input/Output Card Precision Control for Industrial Automation
  • GE FANUC - 531X139APMASM7 Micro Application Board for Industrial Control
  • GE DS3800NPPC - Circuit Board Precision Control in Industrial Automation
  • GE IC200UEX626 - 6-Channel Analog Expansion Module for Advanced Process Control
  • GE IC693PWR331D - Advanced Power Supply for Industrial Automation
  • GE DS200TBQBG1ACB - Advanced RST Analog Termination Board
  • GE Fanuc - DS200TBCAG1AAB Advanced PLC for Industrial Automation
  • GE FANUC - DS200LRPAG1AGF Industrial Line Protection Module
  • GE IC693MDL654 - Advanced Logic Input Module for Industrial Control Systems
  • GE Industrial - Controls IC695LRE001B Transmitter Module
  • GE DS3800HUMB1B1A - Universal Memory Board
  • GE IC660BBD021W - Advanced 3-Wire Sensor Block for Industrial Control Systems
  • GE FANUC - IC694APU300 High-Speed Counter Module
  • GE IC694ACC300 - Input Simulator Module Advanced Control Solutions
  • GE FANUC - IC687BEM713C Advanced Bus Transmitter Module for Industrial Automation
  • GE IS200TGENH1A - Advanced Turbine Control Board for Gas and Steam Turbines
  • GE IC693MDL654F - Advanced Modular PLC Input Module for Industrial Automation
  • GE IS200AEPAH1BMF-P - | IS210BPPCH1AD I/O Pack Processor Board
  • GE IS230TRLYH1B - New in Box | Industrial Control Module
  • GE 489-P5-HI-A20-E - Industrial Generator Management Relay
  • GE Electric - (GE) IS200IVFBG1AAA Fiber Optic Feedback Card for Industrial Automation
  • GE Electric - IC693PWR322LT Advanced Industrial Power Supply
  • GE Fanuc - IC200ALG432 Analog Mixed Module VersaMax
  • GE Fanuc - IC693ALG392 Precision Analog Output for Industrial Control Systems
  • GE Fanuc - IC695ACC402 Evergreen Controller Advanced PLC Solution for Industrial Automation
  • GE IC693ACC300D - Input Simulator Module
  • GE 46-288512G1-F - Advanced Industrial Control Module
  • GE IC755CSS12CDB - High-Performance Control Module
  • GE DS200TCCAG1BAA - High-Performance PLC PC Board
  • GE IC3600TUAA1 - Advanced Industrial Control Module
  • GE 8810 - HI TX-01 Brand New Advanced Industrial Control Module
  • GE 750-P5-G5-D5-HI-A20-R-E - Relay
  • GE Fanuc - IC200MDL330 Network Interface Unit Advanced Networking for Industrial Automation
  • GE Fanuc - IC676PBI008 Waterproof Input Block
  • GE Circuit - Board 304A8483G51A1A
  • GE YPH108B - Measurement Board
  • GE UR6AH - Digital I/O Module Industrial Control
  • GE IC200ALG264E - High Precision Current Analog Input Module
  • GE IS200TRLYH2C - Relay Output Module with Contact Sensing Terminal Board; Manufacturer GE-FANUC
  • GE IC693ALG442B - Advanced Programmable Logic Controller Module
  • GE IC693ACC301 - Lithium Battery Replacement Module
  • GE Fanuc - DS200PTBAG1A Termination Board Advanced Control Module
  • GE IS200VCRCH1BBB - Mark VI Circuit Board
  • GE IS200UCVEH2A - High-Performance Exciter Bridge Interface BOARD for Industrial Automation
  • GE IS220PDIOS1A - Mark VI Control Module
  • GE IS210AEBIH3BEC - Advanced Input/Output Board for MKVI Control Systems
  • GE 6KLP21001X9A1 - AC Variable Frequency Drive
  • GE 531X123PCHACG1 - Advanced Power Supply Interface Card
  • GE Electric - STXKITPBS001 Profibus Interface Module for Industrial Control Systems
  • GE DS200TCRAG1AAA - Industrial Grade Relay Output Board for Enhanced Control Systems
  • GE UR9NH - CPUUR CPU Module
  • GE Electric - DS200TCQFG1ACC
  • GE Electric - Fanuc IC200ALG260H Analog Input Module Precision & Reliability in Automation Solutions
  • GE DS200SLCCG3RGH - Industrial Control Module
  • GE DS3800NMEC1G1H - Industrial Motor Control Module
  • GE Fanuc - 531X113PSFARG1 | Mark VI Circuit Board
  • GE Fanuc - IC693ALG392C Analog Output Module Precision Control in Industrial Automation
  • GE IC693ALG220G - Advanced Input Analog Module for Industrial Automation
  • GE DS200DTBCG1AAA - Industrial Control System's Reliable Core
  • GE F31X301DCCAPG1 - Control Board Advanced Industrial Automation Solution
  • GE Electric - (GE) IS200AEAAH1AAA Mark VI Printed Circuit Board